Hire of power to cool a tunnel

Cooling a tunnel during the plant maintenance

During the maintenance on the cooling system, our customer had to maintain a temperature of 3°C in the tunnel to keep the products fresh and do not interrupt the chain of production.

Customer needs

  • Provision of 35,000 m3 of cooling for 5 days
  • Ensure continuous operation
  • Provision of the required energy to make the cooling system work

Our solution

  • A 300 kW water chiller, 1 air handling 500, 1 air handling 100 KW, a 500 KVA power
  • The cold air had to be placed in the tunnel during the maintenance works
  • Interruptions not allowed

Results

  • No loss of production
  • Full range of cooling solution, energy and assistance

 