Emergency in a hospital

Emergency in a hospital

Following a serious fire in the power centre and the lack of access to the fuel tank, a large European hospital is in blackout. The challenge? Install high-voltage generators with a total capacity of 6 MVA in the same day.

Our solution

  • A 1,25 MW power generator with transformer
  • Installation of additional generators for power to reach 6 MWA
  • Previous installation of 4 MW of power before the addition of two additional generators MWA

Results

  • Immediatly power
  • Problems have been solved

To speak to one of our team in Italy please call

+39 02 484 0491

Send rental enquiry